Categories
- No categories

We recommend owners confirm site utilities (power, potable water, drainage), room environment (ambient temperature, humidity, clearance) and consumable supply before scheduling factory or on‑site training. The training curriculum should combine device theory (controls, alarms, heating, peristaltic pump, automatic pipeline cleaning), mandatory safety skills (pressure alarms, emergency stop, water‑electric isolation) and hands‑on modules (pre‑shift checks, patient set‑up, one‑time infusion assembly, automatic cleaning cycle and basic troubleshooting). Delivery acceptance must include unpacking inspection, power and water checks, functional tests for temperature control, flow range and pressure alarm behavior, plus confirmation of supplied accessories and disposable guide heads. After‑sales boundaries should be documented in the purchase order: we provide factory training and remote follow‑up support; routine consumables, local electrical work, and clinical credentialing remain the clinic’s responsibility.
This guide is written for Colon Hydrotherapy Clinic Owners in the United States who are preparing to install MAIKONG systems (for example MK‑540 and MK‑530). Our objective is to help you link site readiness to an actionable operator training syllabus and an objective delivery acceptance process so training occurs only after the clinic meets the required preconditions.
Do these checks on site and document results in writing. If any item is outstanding, schedule corrective work before factory engineers arrive or remote training begins.
Trainees must understand the system architecture and the safety interlocks that protect patients and equipment. Key topics for classroom or remote theory:

Trainees must show competency in:

Factory training addresses device operation; clinics remain responsible for clinical protocols. The operator syllabus should include:
Use only the specified disposable guide heads and follow manufacturer instructions for pipeline automatic cleaning. The machine supports automatic pipeline cleaning, incoming water filtration and disinfection — document each completed cleaning cycle in patient records. Confirm you have local suppliers for replacement peristaltic pump tubing and disposable guide heads before onboarding.
Use these MAIKONG product facts during training demonstrations so trainees learn to measure real performance against the spec:
| Model | Bed / Main Machine Size | Weight | Power / Voltage | Water Flow Range | Temperature Range |
|---|
At handover confirm each item below and attach results to the delivery report before signing acceptance.
Instead of prescribing numerical session counts, we recommend a competency‑based certification that requires:
Keep trainee records, signed competency checklists and refresher training logs in each operator’s personnel file.
On‑site training (recommended for first installations): full machine setup, hands‑on practical modules, acceptance tests and supervised live sessions. Remote training is effective for classroom theory, user interface walkthroughs, troubleshooting, and follow‑up Q&A. Remote instruction cannot replace on‑site acceptance tests, nor can it legally substitute for local electrical or plumbing work. We provide both on‑site factory training and remote follow‑up support; responsibilities for local electrical/plumbing work, consumable stock and clinical credentialing remain with the clinic.
This document is operational guidance and not medical advice. We do not prescribe clinical protocols or certification criteria mandated by local regulators; clinics must ensure clinical governance, credentialing and local code compliance. Specific electrical and plumbing code compliance for U.S. facilities must be confirmed with local licensed contractors. Product facts are supplier‑reported; check the delivered unit and model manual for exact configuration and software versions.
This content is provided for learning, information sharing and professional communication only. It is not medical advice and is not a basis for treatment or diagnosis. Confirm suitability, operation and purchasing requirements against the product manual, local regulations and qualified professional guidance.
This content is provided for learning, information sharing and professional communication only. It is not medical advice and is not a basis for treatment or diagnosis. Confirm suitability, operation and purchasing requirements against the product manual, local regulations and qualified professional guidance.
If you would like a site‑specific installation and training quote or to schedule factory‑led on‑site acceptance for MK‑540 or MK‑530, please contact us with your room photos, planned utility diagrams and intended machine model. Email lucy@comparable provider.us or call/WhatsApp +86 13570907401.